Skip to product information
1 of 6

Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (10FT, Mint Green) - color: Mint Green, size: 10FT

Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (10FT, Mint Green) - color: Mint Green, size: 10FT

Regular price $24.88 USD
Regular price Sale price $24.88 USD
Sale Sold out
Taxes included. Shipping calculated at checkout.

About this item

  • Dog Training Leash : Elevate your dog's recall skills with our dog waterproof leash. Ideal for outdoor activities like hiking, camping, and beach play, it fosters better obedience and a closer bond.
  • Weatherproof Durability : Crafted from PVC coated nylon webbing, our dog waterproof leash remains lightweight and strong even when wet. It's weatherproof, easy to clean, anti-odor and perfect for all conditions.
  • Strong and Soft leash : Experience a leash that's both strong and gentle. With a remarkable 600 lbs pull force resistance, it offers safety and comfort in various weather conditions.
  • Adventure Ready: Designed for active outdoor moments, our dog leash stands up to play, training, and exploration. It's a reliable companion for all your escapades.
  • Multi color and size: We provide different colors to choose from width 3/5 inch with length 5FT /10FT /15FT /30FT/ 50FT. Find the perfect fit for your dog's needs and your preferences.

Overview

  • Size: 10FT
  • Color: Mint Green
  • Brand: NIMBLE
  • Material: Nylon
  • Product Dimensions: 120"L x 0.4"W
  • Product Dimensions ‏: ‎ 59.06 x 0.75 x 0.04 inches; 6.38 ounces
  • Item model number ‏: ‎ dog leash
  • Date First Available ‏: ‎ April 3, 2021
  • Manufacturer ‏: ‎ Nimble
  • ASIN ‏: ‎ B0B24XT2W2
  • Best Sellers Rank: #3,532 in Pet Supplies (See Top 100 in Pet Supplies) #11 in Dog Training Leashes
  • Customer Reviews: 4.4 4.4 out of 5 stars (2,736)
Quantity

Low stock: 10 left

View full details
  • ⭐⭐⭐⭐⭐

    Jason Reed — Portland, Oregon
    The products I ordered from StableWise were practical and easy to use. Each item matched its description and helped make my daily horse-care routine more organized.

  • ⭐⭐⭐⭐⭐

    Lauren Mitchell — Denver, Colorado

    I found useful equipment for feeding and caring for my goats. Ordering was straightforward, and everything arrived in good condition. I would shop with StableWise again.

  • ⭐⭐⭐⭐⭐

    Daniel Brooks — Austin, Texas
    StableWise offers a convenient selection of supplies for sheep care. The product information made it easier to compare options and choose items suited to my flock.

  • ⭐⭐⭐⭐⭐

    Emily Carter — Seattle, Washington
    The tack and grooming supplies I purchased have worked well for my regular barn routine. The products were simple to use, practical, and accurately described.

FAQ

What types of products does StableWise sell?

StableWise offers supplies and accessories specifically for horses, sheep, and goats. Our collections include horse tack and wear, grooming and hoof-care tools, feeding and watering equipment, fencing supplies, identification products, sheep and goat care essentials, barn organization, and transport accessories.

How much does shipping cost?

Our standard flat shipping fee is generally $6.90 per order. Any different charge for oversized products, remote destinations, international delivery, or optional shipping services will be displayed at checkout before payment.

How long does order processing take?

Most orders are processed within 1–3 business days, Monday through Friday, excluding holidays. Processing may take up to 5 business days during busy periods, holidays, inventory verification, or when an order contains oversized or separately sourced products.

How long will delivery take?

After processing and dispatch, estimated delivery is generally 5–10 business days within the United States and 10–20 business days for available international destinations. Carrier delays, weather, customs, and remote locations may affect delivery.

How can I track my order?

We will send a shipping confirmation email with tracking information when it becomes available. Tracking may require approximately 2–5 days after dispatch to display its first update, depending on the carrier and logistics provider.

Can I change or cancel my order?

Contact us as soon as possible, preferably within 12 hours after placing your order. We will try to assist, but changes and cancellations are not guaranteed once processing, fulfillment, or shipment has begun.

What is your return policy?

Eligible unused products may be returned within 30 days after delivery. Items must be in their original condition with packaging, accessories, manuals, and tags. Contact us for authorization before returning anything, as our business address is not necessarily the applicable return address.

What should I do if my order arrives damaged, defective, or incorrect?

Contact us within 7 calendar days after delivery whenever reasonably possible. Include your order number and clear photographs of the product, packaging, shipping label, and damage or issue. Keep all products and packaging until we provide instructions.

How do I choose the correct product for my animal?

Review the product’s species guidance, measurements, materials, adjustment range, capacity, warnings, and intended use before purchasing. Fit and suitability may vary according to the animal’s breed, size, age, condition, and behavior. Consult a qualified veterinarian or appropriate animal-care professional when specialized advice is needed.

How can I contact StableWise customer support?

Email us at gtdkoteenoyr44@gmail.com or call +1 (936) 260-5549. Email is recommended for order-related inquiries because it allows you to include your order number, description of the issue, and relevant photographs.