{"product_id":"waterproof-dog-training-leash-50ft-30ft-15ft-10ft-5ft-heavy-duty-recall-long-lead-for-large-medium-small-dogs-15ft-light-yellow-color-light-yellow-size-15ft","title":"Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (15FT, Light Yellow) - color: Light Yellow, size: 15FT","description":"\u003ch3\u003eAbout this item\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003eDog Training Leash : Elevate your dog's recall skills with our dog waterproof leash. Ideal for outdoor activities like hiking, camping, and beach play, it fosters better obedience and a closer bond.\u003c\/li\u003e\n\u003cli\u003eWeatherproof Durability : Crafted from PVC coated nylon webbing, our dog waterproof leash remains lightweight and strong even when wet. It's weatherproof, easy to clean, anti-odor and perfect for all conditions.\u003c\/li\u003e\n\u003cli\u003eStrong and Soft leash : Experience a leash that's both strong and gentle. With a remarkable 600 lbs pull force resistance, it offers safety and comfort in various weather conditions.\u003c\/li\u003e\n\u003cli\u003eAdventure Ready: Designed for active outdoor moments, our dog leash stands up to play, training, and exploration. It's a reliable companion for all your escapades.\u003c\/li\u003e\n\u003cli\u003eMulti color and size: We provide different colors to choose from width 3\/5 inch with length 5FT \/10FT \/15FT \/30FT\/ 50FT. Find the perfect fit for your dog's needs and your preferences.\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch3\u003eOverview\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eSize:\u003c\/strong\u003e 15FT\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eColor:\u003c\/strong\u003e Light Yellow\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBrand:\u003c\/strong\u003e NIMBLE\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMaterial:\u003c\/strong\u003e PVC coated nylon\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProduct Dimensions:\u003c\/strong\u003e 600\"L x 0.4\"W\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProduct Dimensions ‏:\u003c\/strong\u003e ‎ 600 x 0.4 x 0.04 inches; 9.14 ounces\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eItem model number ‏:\u003c\/strong\u003e ‎ dog leash\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDate First Available ‏:\u003c\/strong\u003e ‎ May 15, 2023\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eManufacturer ‏:\u003c\/strong\u003e ‎ Nimble\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eASIN ‏:\u003c\/strong\u003e ‎ B0C5D66W8B\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBest Sellers Rank:\u003c\/strong\u003e #3,572 in Pet Supplies (See Top 100 in Pet Supplies)\n#11 in Dog Training Leashes\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCustomer Reviews:\u003c\/strong\u003e 4.4 \n4.4 out of 5 stars\n   (2,736)\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"NIMBLE","offers":[{"title":"Default Title","offer_id":48688110633154,"sku":"B0C5D66W8B-color-light-yellow-size-15ft","price":28.2,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0757\/9765\/9842\/files\/4115oEgcfhL_b82258e7-3137-4bb3-9382-943f1c1f97ab.jpg?v=1787808878","url":"https:\/\/stablewise.us\/products\/waterproof-dog-training-leash-50ft-30ft-15ft-10ft-5ft-heavy-duty-recall-long-lead-for-large-medium-small-dogs-15ft-light-yellow-color-light-yellow-size-15ft","provider":"StableWise","version":"1.0","type":"link"}