{"product_id":"vivifying-waterproof-dog-leash-20ft-dog-training-leash-durable-pvc-coated-webbing-long-lead-with-soft-handle-for-camping-backyard-playing-beach-and-lakeblack-color-black-size-20ft","title":"Vivifying Waterproof Dog Leash, 20FT Dog Training Leash Durable PVC Coated Webbing Long Lead with Soft Handle for Camping, Backyard Playing, Beach and Lake(Black) - color: Black, size: 20ft","description":"\u003ch3\u003eAbout this item\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003eWATERPROOF AND EASY TO CLEAN - Durable PVC coated webbing is super material to create waterproof dog leash. It’s easy to clean, quick dry, dirt runs off with simple rinses. Designed to face water, snow, mud and come out like new. Applicable for swimming pool, beach and lake\u003c\/li\u003e\n\u003cli\u003e20FT DOG LEASH - Our long dog line measures 0.08inch thick 0.8inch wide and 20ft long, provides extra durability for large medium small dogs. Upgraded dog training lead will not get stiff during extreme cold and will not melt during extreme heat. NOTES：NOT A CHEW PROOF MATERIAL, NOT TO BE USED FOR TIE OUT\u003c\/li\u003e\n\u003cli\u003eSOFT PADDED HANDLE - The handle inside layer of this long line lead is designed with a soft cotton to provide extra comfort to your hands during long training and walking. It can be wound around your hand to adjust the length without hurting your hand like any other long dog lead\u003c\/li\u003e\n\u003cli\u003e360°ROTATED ZINC ALLOY BUCKLE - The buckle of this long lead leash is made of zinc alloy, more durable and harder than pure metal. It’s easy to attach dog collar, rotated by 360 degree allows your dogs to play more secure\u003c\/li\u003e\n\u003cli\u003eGREAT FOR TRAINNING AND SWIMMING - This kind of long leash a perfect balance between freedom and control. It is a very useful and simple training tool, suitable for all dogs, especially large breed dogs, such as Samoyed, Husky, Alaska, Golden Retriever, German Shepherd, Tibetan Mastiff and so on\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch3\u003eOverview\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eSize:\u003c\/strong\u003e 20ft\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eColor:\u003c\/strong\u003e Black\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBrand:\u003c\/strong\u003e Vivifying\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMaterial:\u003c\/strong\u003e PVC Coated Webbing, Rubber\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProduct Dimensions:\u003c\/strong\u003e 240\"L x 0.78\"W\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProduct Dimensions ‏:\u003c\/strong\u003e ‎ 240 x 0.8 x 0.04 inches; 11.99 ounces\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDate First Available ‏:\u003c\/strong\u003e ‎ May 31, 2021\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eManufacturer ‏:\u003c\/strong\u003e ‎ Vivifying\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eASIN ‏:\u003c\/strong\u003e ‎ B0967G6DR7\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBest Sellers Rank:\u003c\/strong\u003e #33,549 in Pet Supplies (See Top 100 in Pet Supplies)\n#131 in Dog Training Leashes\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCustomer Reviews:\u003c\/strong\u003e 4.6 \n4.6 out of 5 stars\n   (917)\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Vivifying","offers":[{"title":"Default Title","offer_id":48618766663874,"sku":"B0967G6DR7-color-black-size-20ft","price":24.88,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0757\/9765\/9842\/files\/41_lYZb52cL.jpg?v=1786740303","url":"https:\/\/stablewise.us\/products\/vivifying-waterproof-dog-leash-20ft-dog-training-leash-durable-pvc-coated-webbing-long-lead-with-soft-handle-for-camping-backyard-playing-beach-and-lakeblack-color-black-size-20ft","provider":"StableWise","version":"1.0","type":"link"}